Clackers Brook

Site plan 1:

 

Click here to download a larger PDF version of the site plan.

Site plan 2:

 

Click here to download a larger PDF version of the site plan.

Site plan 3:

 

Click here to download a larger PDF version of the site plan.

Grounds maintenance frequencies

Reference Works Required (Once Transferred) Visits p.a.
LEAP Visual Inspection 52
Physical Inspection 12
Boundary Maintenance 2
Sinking Fund 0.1
Amenity Grass Mowing 14
Existing trees Annual maintenance 1
Hedgerows Cutting 1
Strim Base 2
Litter Bin Emptying 52
Litter Picking ad hoc
Attenuation Swale Strim to banks 2
Remove obstructions 0.5
Brook Strim to banks 6
Remove obstructions 0.5
Other Street furniture, block paving - sinking funds etc